FRC Robowarriors – Build Blog Day 6/7 (Monday, Tuesday)
Week 2 Authored by Ishan Deshpande Summary: Testing of the shooter mechanism in our main atrium as well as more construction of the TARGET apparatus Description: Most of the time…
Week 2 Authored by Ishan Deshpande Summary: Testing of the shooter mechanism in our main atrium as well as more construction of the TARGET apparatus Description: Most of the time…
Week 1 Authored by Ishan Deshpande Summary: Assembly of the GENERATOR SWITCH as well as wiring up and making our test robot functional. Also brainstormed a lot more as a…
Week 1 Authored by Ishan Deshpande Summary: Basic brainstorming and prototyping of several different ideas for climbing and shooting mechanisms. Description: Monday and Tuesday were days off for our school…
Week 1 Authored by Ishan Deshpande The kickoff unveiling was this Saturday. While the Robowarriors arrived at 9:30 AM to view the livestream on our lead mentor’s (Craig Wilmot) projector,…